LNG & Energy
Coating and insulation on modules, piping, valves and components for liquefaction and processing plants.
Experience gained on projects involving
- 2024 — presentCalcasieu Pass 2 — QA/QC Field Coating Inspector for Contec S.p.A., attendance at the Baker Hughes site in Carrara Avenza.
- 2023 — 2024Plaquemines LNG — coating inspection on the modules, for Contec S.p.A., at Baker Hughes Carrara Avenza.
- 2023Ichthys LNG — QA/QC coating inspector on control valves, for G.I.S. International.
- 2021LNG Canada — QA/QC field inspector on coating, insulation and testing of the liquefaction modules, for JGC Corporation; attendance at Cimolai (San Giorgio di Nogaro, Roveredo, Monfalcone) and Baker Hughes Carrara/Avenza.
- 2021Baltic Pipe — third party inspection for Renco: defect assessment on TSA thermal spray metallising, Ravenna.
- 2014 — 2015Tempa Rossa — QA/QC inspector for RINA Service on behalf of TOTAL: qualification of coating procedures, plant and operators; 3LPE pipe coating at Socotherm Plant Adria.
- 2014Moho Nord — QA/QC pipe coating inspector for TOTAL E&P Congo: 3LPP+RC+CWC, Concrete Weight Coating at differing thicknesses, Socotherm Plant Adria and the Ravenna terminal.
- 2014Tamar — Noble Energy — 3LPP+RC system on pipeline, Socotherm Adria.
- 2011 — 2013TOTAL E&P UK Laggan-Tormore — QA/QC inspector on protective coatings for carbon steel structures and stainless steel piping, for OMA S.p.A. at GE Nuovo Pignone, Massa-Carrara.